第六章单元测试
- Overheads is also known as( ).
- Prime cost includes ( ) ?
- OAR is an abbreviation for overheads absorption rate.( )
- Rent and rates, light and heats always use value as absorption basis.( )
- Budgeted overheads for machining are 25000. There are 2500 budgeted machine hours in machining. The OAR per machine hour in machining is 10.( )
A:Material cost B:Direct cost C:Labour cost D:Indirect cost
答案:Indirect cost
A:Direct Materials B:Direct Labour C:Indirect expenses D:Royalty and other direct expenses
A:错 B:对
A:对 B:错
A:对 B:错
温馨提示支付 ¥3.00 元后可查看付费内容,请先翻页预览!