The ultimate goal of smart grid is to build a panoramic real-time system covering the whole production process, including ( ) and other links.
答案:Generation and transmission of electricity, conversion and distribution of electricity, electricity and dispatching of electricity
Regarding the factors that affect the reliability of the distribution network, the following is true ( ) .
答案:Power Grid structure, equipment quality, load level, automation level, the level of Operation Management
State Grid Corporation of China began to develop and build enterprise-class big data platform. The Year of the pilot study of big data application was ( ) .
答案:2014
About Smart Grid big data application prospects, the following are true ( ) .
答案:Improving the economy of grid operation;Enhancing the capacity of the grid to absorb new energy sources;Improving grid security and reliability of power supply;Improving smart grid services to consumers and society
The challenges to smart grid big data,the following are true ( ) .
答案:Difficulties in obtaining quality data;Broad Range of disciplines and high level of technical complexity;There is no consensus on big data;Research on the method of talent team construction and the need of joint mechanism of tackling key problems;Lack of systematic methodology and industry standard specifications