第十三章单元测试
  1. The system start and stop control process includes power on initialization, abnormal state detection, system status display, system readiness check and system start / stop operation.( )

  2. A:错 B:对
    答案:对
  3. The origin proximity switch is an inductive proximity sensor. Its installation position provides the origin information of linear motion. Both the left and right limit switches are micro switches with contacts, which are used to provide protection signals in case of overtravel fault: when the sliding slide passes the left or right limit position in motion, the limit switch will act, thus sending the overtravel fault signal to the system.( )

  4. A:对 B:错
  5. The servo system has a good tracking ability to the given position signal, so it can still accurately reach the target position when it runs again after suspension.( )

  6. A:对 B:错
  7. the controller (PLC) selected for the conveying unit is Mitsubishi company_______.( )

  8. A:FX3U-48MR B:FX3U-32MT C:FX3U-32MR D:FX3U-48MT
  9. The PLC of the conveying unit uses transistor output, and outputs the power polarity of the common terminal during wiring.


  10. A:错 B:对

温馨提示支付 ¥3.00 元后可查看付费内容,请先翻页预览!
点赞(3) dxwkbang
返回
顶部